Free tool · Viksit Gujarat Industrial Policy 2026
Gujarat subsidy calculator: every incentive, one estimate
Choose your taluka, sector and investment. The calculator applies the VGIP 2026 rates for your taluka category, adds electricity duty exemption and the customs route for imported machinery and raw material — EPCG if you export, MOOWR if you sell in India — and shows one estimate with every assumption spelled out.
20+ years in Gujarat incentives300+ projects99% filing success
Illustrative estimate for a ₹10 crore MSME in the general sector, Category-A taluka, with ₹5 lakh of monthly HT consumption charges. Your result depends on your own inputs.
- 268talukas, category set for you
- 6incentives in one estimate
- Freeno sign-up needed
Why manufacturers use us
From estimate to disbursement
We have filed incentive claims for Gujarat manufacturers for more than 20 years — from one-plant MSMEs to multinational groups.
- 20+years of Gujarat incentive work
- 300+projects delivered
- 99%filing success rate
- 15+services we offer
NeoApex Saver Pvt Ltd provided excellent policy advisory and handled the Electricity Duty Exemption process with complete professionalism. Their strong understanding of industrial incentive frameworks helped our facility secure the benefit smoothly, resulting in ₹5+ Crore in projected electricity duty savings.
We have completed 15+ unit projects across Gujarat and our experience with the NeoApex Saver team has been excellent. Their deep understanding of government incentive frameworks and Electricity Duty Exemption policies helped us navigate complex compliance smoothly. Their strategic guidance ensured timely approvals and resulted in significant long-term savings for our organization.
NeoApex Saver Pvt Ltd handled our case with strong policy expertise and consistent regulatory follow-up. Their support helped our facility secure Electricity Duty Exemption smoothly, resulting in significant multi-crore operational savings.
Six benefits, one estimate
The calculator combines the three VGIP 2026 subsidies — capital, interest and power tariff — with electricity duty exemption and the customs route for imported machinery and raw material: EPCG and duty-free inputs for exporters, MOOWR for units selling in India.
How the estimate works
It reads your taluka category, enterprise size and sector, applies the matching rate table from the VGIP 2026 GRs, and keeps capital, interest and power tariff subsidy within the yearly and combined ceilings. Blank fields get a stated assumption, never a hidden one.
- Taluka category. Under GR IMD/HMR/e-file/9/2026/2211/I of 8 September 2026, 130 talukas are Category A and 138 are Category B. Category A carries the higher rates.
- Enterprise size. Micro up to ₹2.5 crore of plant and machinery, small up to ₹25 crore and medium up to ₹125 crore, counting all your units in India; above that, Large. Mega and Ultra Mega need a thrust sector, ₹1,000 crore or ₹10,000 crore of investment, and 250 or 3,000 direct jobs.
- Eligible investment. Plant and machinery plus buildings and civil works. Land, working capital, second-hand machinery and pre-operative costs do not count.
- Ceilings. Capital, interest and power tariff subsidy together stay within a combined ceiling of 15% to 50% of EFCI, depending on size, sector and category, inside yearly ceilings and, for large projects, an absolute yearly cap. The calculator pays the capital subsidy first and fits the other two into the room left.
- Electricity. One figure drives both power tariff subsidy and electricity duty: monthly energy charges, monthly units, or sanctioned load in kVA converted at two shifts (416 hours a month, 0.6 load factor, 0.9 power factor) and ₹8 a unit. We treat a contract demand of 100 kVA or more as HT supply (above 650 V, 15% duty) and anything below as LT (10%).
- Outside the ceiling. Electricity duty exemption and customs benefits are added separately, each over its own period: 5 years of duty (10 for a new SEZ unit), the duty waived on EPCG machinery, and 5 years of duty-free raw material for exporters.
- Totals. Undiscounted and before tax. Customs savings count basic customs duty and surcharge; IGST not paid at import is shown as a cash-flow gain because it is normally recovered as input tax credit. Duty deferred under MOOWR is shown beside the total, not inside it.
Subsidy calculator: questions we get asked
How accurate is this Gujarat subsidy calculator?
It uses the rates, caps and ceilings in the VGIP 2026 scheme GRs of 8 and 25 September 2026, the taluka classification GR of 8 September 2026, the Gujarat Electricity Duty Act, 1958 and the customs rules for EPCG and MOOWR. The final amount depends on the eligible fixed capital investment the department verifies and on your actual loan and power use, so treat the result as a planning estimate, not a sanction.
How is my taluka category decided?
By the taluka classification GR of 8 September 2026, which places 130 talukas in Category A and 138 in Category B. Pick your taluka and the calculator applies its category. If a project spans more than one taluka, the taluka with the largest share of the project land decides.
Can I claim capital, interest and power tariff subsidy together?
Yes. Under VGIP 2026 a unit can take any one of the three or any combination, but together they cannot exceed the combined ceiling for its category — for example 45% of EFCI for a general-sector MSME in Category A — and each year is limited by an annual ceiling with no carry-forward.
Is electricity duty exemption part of VGIP 2026?
Both VGIP 2026 scheme GRs say eligible units get exemption from electricity duty as applicable under the Gujarat Electricity Duty Act, 1958. It is claimed separately and sits outside the combined ceiling, so the calculator adds it on top.
Does the estimate include central government schemes?
It includes the customs benefits decided when you import. If you export, imported machinery goes under EPCG — duty waived against exports of six times the duty saved within six years — and imported raw material for export production comes in duty-free under Advance Authorisation or MOOWR. If you sell in India, MOOWR defers the duty on both with no export obligation; the calculator shows that deferred duty separately, because it is paid later rather than saved. It also lists other central schemes that may fit your sector. State and central incentives together cannot exceed your eligible fixed capital investment.
How does the calculator use sanctioned load?
If you do not know your bill or units yet, enter the sanctioned load or contract demand in kVA. The calculator assumes two shifts — 416 running hours a month at a 0.6 load factor and 0.9 power factor — and energy charges of ₹8 a unit, so 500 kVA becomes about 1,12,320 units and ₹8.99 lakh a month. A contract demand of 100 kVA or more is treated as HT supply, which pays 15% electricity duty; below that it is LT at 10%.
What changes for an expansion project?
An expansion must add at least 50% to the existing gross fixed capital investment excluding land, with at least 60% of the new investment in plant and machinery, raise capacity by 50% and follow at least 75% utilisation in one of the previous three years. Only the extra power consumption on a sub-meter earns power tariff subsidy. Inside an SEZ only a new unit gets the electricity duty exemption; an SEZ expansion does not.
Which fields can I leave blank?
Everything except the taluka and the investment is optional. Leave the loan, interest rate or tenure blank and the calculator assumes a term loan of 70% of EFCI at 9.5% over 7 years; leave electricity blank and power tariff subsidy and electricity duty wait until you add a bill, units or sanctioned load. Every assumption is listed under the result.
Do Mega and Ultra Mega projects get a different package?
Yes. Mega (from ₹1,000 crore of investment and 250 direct jobs) and Ultra Mega (from ₹10,000 crore and 3,000 direct jobs) are for thrust and selected thrust sectors, with periods of 10 to 12 years, absolute yearly caps of ₹750 crore and ₹1,250 crore, and the option of a customised package from the High Powered Committee. The calculator assumes the jobs test is met once the investment crosses the threshold and says so in its notes.