CEICED is the Chief Electrical Inspector and Collector of Electricity Duty, the Government of Gujarat office, under the Energy and Petrochemicals Department, that combines two functions. One is the electrical inspectorate, which checks installations, lifts and DG sets for safety. The other is the electricity duty office, which applies the Gujarat Electricity Duty Act, 1958.
For a manufacturer it is where the five-year electricity duty exemption for a new unit is applied for. The application is made online, on the CEICED e-services portal, within 90 days of the date production starts. That limit is Rule 11(3) of the Bombay Electricity Duty (Gujarat) Rules, 1986. It is also where a generating set is registered on Form C. Amendment rules dated 25 January 2024 changed who the Rules name. They now name the Commissioner of Electricity Duty (the Chief Commissioner of State Tax) wherever they used to name the Collector. With ₹10 lakh a month of consumption charges on HT, filing in time is worth ₹1.5 lakh a month, ₹90 lakh over five years.
CEICED full form, and the two offices behind it
The name joins two statutory posts, and CEICED’s website, ceiced.gujarat.gov.in, presents them side by side. Your CEICED login is on a separate portal, ceicedeservice.gujarat.gov.in (the website’s “CEICED E-Services” link), and that is where applications are filed.
Chief Electrical Inspector
This officer is appointed by the State under section 162 of the Electricity Act, 2003. CEICED lists the inspectorate’s work as electrical inspection, quality control, lift inspection, energy audit and licensing. For a factory the usual touchpoint is safety. A DG set above 10 kW (12.5 kVA) must be inspected and approved by the Electrical Inspector before it is commissioned.
Collector of Electricity Duty
The duty side of the office collects electricity duty at the correct rates and grants rate relief and exemptions. It also checks the duty that DISCOMs and other licensees collect and pay over. The office works under the Gujarat Electricity Duty Act, 1958 and the Bombay Electricity Duty (Gujarat) Rules, 1986.
Electricity duty is a State tax on the electricity you consume, and your DISCOM adds it to every bill. For a factory it is 15% of consumption charges on an HT connection and 10% on LT. Power the factory generates and uses itself carries 60 paise a unit. Who qualifies for the exemption, and what it saves, is on our page on electricity duty exemption in Gujarat.
The Commissioner of Electricity Duty and what changed in January 2024
The Bombay Electricity Duty (Gujarat) (Amendment) Rules, 2024 are dated 25 January 2024 and followed draft rules the Finance Department published on 6 December 2023. They change the 1986 Rules in three ways:
- A new definition. The “Commissioner of Electricity Duty” is the Chief Commissioner of State Tax, Gujarat State, who administers the Act and the Rules.
- No more Collector in the Rules. They used to say “Collector of Electricity Duty” or “Collector of Electricity Duty, Gandhinagar”. In every such place they now say “Commissioner of Electricity Duty or an officer authorized by him in this behalf”.
- State Tax Inspectors are deemed qualified to be appointed as Inspectors under section 6 of the Act.
In practice, the Act and the Rules are now administered from the State Tax side of the Finance Department. Monthly duty payments and returns, on DG power for example, are made on the electricity duty e-payment portal, cedepayment.gujarat.gov.in. Applications such as the exemption and Form C still start on the CEICED e-services portal. The CEICED website still lists the Collector of Electricity Duty wing.
Old letters, new names. Certificates and letters issued before 2024 carry the Collector’s name. A query or a correction may follow from them. For that, the Rules now point to the Commissioner of Electricity Duty or the officer he authorises.
CEICED e-services and forms a manufacturer uses
| Filing | When to file |
|---|---|
| Electricity duty exemption, new industrial unitAct s.3(2)(vii) · 5 years from the day production starts | Within 90 days of the date production starts. File later and the months already passed are forfeited (Rule 11(3)) |
| Exemption for an additional unit or expansionAct s.3(2)(viii) · outside an SEZ · 5 years on its own consumption | The same 90 days, on a separate meter. The new plant and machinery must be at least 50% of the existing gross block |
| Generating set duty registrationForm C | After the set is energised. Sets on site totalling 125 kVA or less pay no duty but are still registered and file a Nil return each month |
| Reduced duty for furnace and electro-processesForm E8 · Act s.3(3) | Once the DISCOM has sealed a separate sub-meter on the process load. The form and its documents are emailed to the electricity duty office |
A DG set above 10 kW (12.5 kVA) also needs the Electrical Inspector’s approval before it is commissioned. Both steps are explained on our page on DG set registration in Gujarat. The furnace route is on furnace electricity duty relief.
The 90 days on CEICED, in rupees
A new HT unit with ₹10 lakh a month of consumption charges saves ₹1.5 lakh of duty a month. That is ₹90 lakh over five years, if it applies on CEICED within 90 days.
- The unit is a new engineering plant at Halol, on an HT connection from MGVCL in its own name.
- Its bill is ₹10 lakh a month of consumption charges, so 15% duty is ₹1.5 lakh a month.
- Production starts on 1 February 2027 in this example.
| Date | What happens |
|---|---|
| 1 February 2027production starts | The five-year exemption window opens, whether or not an application has been made |
| 2 May 2027day 90 | Last day to apply on CEICED and keep all five years |
| Until the certificate | The DISCOM keeps billing duty, ₹1.5 lakh a month, which is refunded or adjusted once it has the certificate |
| 31 January 2032five years later | The exemption ends, and duty returns to the bill from the next day |
- Filed five months after production starts, the application loses the five lapsed months under Rule 11(3). That is ₹7.5 lakh, unless the State condones a delay beyond the unit’s control. The window still ends on 31 January 2032. More in what the 90-day rule costs, month by month.
- On LT the same ₹10 lakh of charges carries 10% duty, ₹1 lakh a month, ₹60 lakh over five years.
- In an SEZ a new unit gets ten years instead of five, ₹1.8 crore on the same HT bill.
Source: Gujarat Electricity Duty Act, 1958, s.3(2)(vii) and Schedule I, and Bombay Electricity Duty (Gujarat) Rules, 1986, Rule 11(3). The figures are rounded for illustration.
What to have ready when applying on CEICED
Take the connection in the unit’s own name
Meter staff housing, the canteen and other non-industrial loads separately, and give an expansion its own meter. The exemption covers only what the meter shows as the unit’s industrial consumption.
Before the connection is releasedRecord the first day of production
The five years run from the day the unit first manufactures or produces goods. Neither the first bill nor the certificate starts the clock. Note it in the production register that day and keep the first sales invoice.
Day oneApply online on CEICED e-services
Proof of investment in new plant and machinery, the connection in the unit’s name and the production evidence. Put every DG set in the same application.
Within 90 daysExpect queries, and possibly a site inspection
Keep every answer consistent with the invoices, meter details and dates in the application. The 90 days do not pause for queries, so file first and complete the file on query.
As raisedSend the certificate to the DISCOM
The duty line drops to zero from the next bill, and duty billed since the production date is refunded or adjusted. Check each bill until it is.
As soon as it is issued
Our page on electricity duty exemption in Gujarat has the full eligibility rules, the 50% expansion test and a calculator. For a new plant, read electricity duty exemption for new industrial units in Gujarat.
Who does what between CEICED, the DISCOM and the State Tax office
| Task | Who handles it |
|---|---|
| Approving a DG set above 10 kW before commissioning | The Electrical Inspector: CEICED’s inspectorate |
| Exemption application and certificate of eligibility | Filed on the CEICED e-services portal, and the certificate then goes to your DISCOM |
| Charging duty on the bill | Your DISCOM or licensee (UGVCL, MGVCL, DGVCL, PGVCL, Torrent Power and others) until it has the certificate |
| Furnace-rate relief on Form E8 | Emailed, with its documents, to the electricity duty office |
| Duty on DG power: monthly payment and return | The electricity duty e-payment portal, by the 10th of the following month |
| Administering the Act and the Rules | The Commissioner of Electricity Duty: the Chief Commissioner of State Tax since January 2024 |
The exemption is statutory and sits outside the Viksit Gujarat Industrial Policy 2026 combined ceiling. So an eligible new unit claims it alongside the power tariff subsidy in Gujarat.
Frequently asked questions about CEICED Gujarat
What is the full form of CEICED?
The full form of CEICED is Chief Electrical Inspector and Collector of Electricity Duty. It is the Government of Gujarat office, under the Energy and Petrochemicals Department, that combines the electrical inspectorate with the electricity duty office. Its website is ceiced.gujarat.gov.in, and its applications, including the electricity duty exemption, run on ceicedeservice.gujarat.gov.in.
What does the Chief Electrical Inspector of Gujarat do?
CEICED lists the inspectorate’s work as electrical inspection, quality control, lift inspection, energy audit and licensing. The State appoints the Chief Electrical Inspector under section 162 of the Electricity Act, 2003. For a factory, the usual touchpoint is safety. A DG set above 10 kW (12.5 kVA) must be inspected and approved by the Electrical Inspector before it is commissioned.
Who is the Collector of Electricity Duty in Gujarat now?
The 1986 Rules no longer name a Collector. Their wording was changed by the Bombay Electricity Duty (Gujarat) (Amendment) Rules, 2024, dated 25 January 2024. It now reads “Commissioner of Electricity Duty or an officer authorized by him in this behalf”. That Commissioner is the Chief Commissioner of State Tax, Gujarat State. The CEICED website still lists the Collector of Electricity Duty wing. Applications such as the exemption still start on its e-services portal.
How do I apply for electricity duty exemption on CEICED?
Apply online, on the CEICED e-services portal, within 90 days of the date the unit first manufactures or produces goods. Attach proof of investment in new plant and machinery, the power connection in the unit’s own name and the production evidence. Put every DG set in the same application. After queries or an inspection the certificate of eligibility is issued, and you send it to the DISCOM. A late application forfeits the months already passed under Rule 11(3), unless the State condones a delay beyond the unit’s control.
Does the DISCOM stop charging electricity duty when I apply on CEICED?
No. The DISCOM keeps charging duty until it receives the certificate of eligibility. Duty billed between the date production started and the certificate is refunded or adjusted. That is why the production date should be recorded on the day itself.
Where is the CEICED login?
On the CEICED e-services portal, ceicedeservice.gujarat.gov.in, which the CEICED website links as “CEICED E-Services”. Applications such as the electricity duty exemption and Form C for a generating set are filed there. Monthly duty payments and returns are on a separate portal, cedepayment.gujarat.gov.in.
Is CEICED the same as the electricity duty e-payment portal?
No. Applications start on the CEICED e-services portal. These are the exemption for a new unit or an expansion, and Form C for a generating set. The furnace-rate form E8 is emailed to the electricity duty office. Monthly duty payments and returns, for example on DG power, are made on the electricity duty e-payment portal, cedepayment.gujarat.gov.in. They are due by the 10th of the following month.
Starting production soon?
Send us the connection details, the expected production date and the DG sets on site. We file on CEICED inside the 90 days, answer the queries, and follow the certificate to your DISCOM and the refund of duty already billed.