Industrial areas · Kutch: Mundra, Gandhidham and Anjar
Incentives for a unit in Mundra SEZ and Kandla SEZ: category, subsidies and filing
Kutch has Gujarat’s two port zones. Kandla SEZ at Gandhidham opened in March 1965 as the country’s first free trade zone and became a special economic zone in 2000. Mundra’s two multi-product zones cover 6,473 notified hectares beside the Adani port, with a free trade and warehousing zone and a rail line to Adipur. The Viksit Gujarat Industrial Policy 2026 lists both talukas, Mundra and Gandhidham, in Category B. An MSME’s capital subsidy is 25%, its interest subsidy 7% and its power subsidy ₹1 a unit, capped together at 35%. A new unit inside either zone is exempt from electricity duty for ten years instead of five. Each port has its own Customs Commissionerate. We file for units inside the zones and outside the gate.
20+ years in Gujarat incentives300+ projects99% filing success
Mundra and Gandhidham talukas, Kachchh district. Both are Category B in the taluka GR of 8 September 2026, with Anjar, Bhachau, Bhuj and Abdasa. Rapar, Nakhatrana, Lakhpat and Mandvi are Category A.
- Bcategory of Mundra taluka and of Gandhidham taluka, which holds Kandla SEZ
- 1965the year Kandla opened as the country’s first free trade zone, and a special economic zone since November 2000
- 6,473 hanotified in Mundra’s two multi-product zones, with a 168 ha free trade and warehousing zone
On this page
Mundra SEZ and Kandla SEZ at a glance, with talukas, category, DISCOM and offices
Both zones are in Category B talukas. PGVCL supplies power across Kutch, with the zone’s own licensee inside Mundra SEZ. MSME claims go to the District Industries Centre, Kutch, at Bhuj. Customs is split in two, the Mundra Commissionerate for Mundra taluka and the Kandla Commissionerate for the rest of the district. Details of each are set out below.
- Talukas and category
- Mundra taluka (the port and Mundra SEZ) and Gandhidham taluka (Kandla SEZ and Deendayal Port), Kachchh district. Both are Category B under GR IMD/HMR/e-file/9/2026/2211/I of 8 September 2026
- Kandla SEZ
- Kandla SEZ is at Gandhidham, near Deendayal Port. It was set up in March 1965 as the country’s first free trade zone and converted into a special economic zone in November 2000. The zone is multi-product and administered by the Development Commissioner, KASEZ
- Mundra SEZ
- Two notified multi-product zones of 6,473 hectares beside Mundra port, developed by Adani Ports and SEZ. They have a 168 hectare free trade and warehousing zone and the Mundra-Adipur rail line. A Development Commissioner’s office and Customs sit inside the zone
- DISCOM
- PGVCL (Paschim Gujarat Vij Company) across Kutch, and inside Mundra SEZ the zone’s deemed distribution licensee, MPSEZ Utilities. The incentives follow either
- DGFT (EPCG)
- Regional Authority Ahmedabad for units outside the zones, Kutch being excluded from Rajkot’s jurisdiction under Appendix 1A. The Development Commissioner for units inside a zone
- Customs (MOOWR)
- Principal Commissioner of Customs, Mundra, for the whole of Mundra taluka. Commissioner of Customs, Kandla, for the rest of Kachchh (CBIC Notification 21/2022-Customs N.T.)
- Sanctioning offices
- District Industries Centre, Kutch, at Bhuj for MSME claims
Space inside a zone is allotted by its developer, and a zone unit’s approvals run through the Development Commissioner. We deal with the incentives, State and Central, for units inside a zone and on the land outside its gate.
What a unit in Mundra and Kandla SEZ earns under VGIP 2026
Both zones stand in Category B talukas, Mundra and Gandhidham. So the State package for an MSME is 25% of eligible fixed capital investment in capital subsidy and 7% a year in interest subsidy. Power from PGVCL, or from MPSEZ Utilities inside Mundra SEZ, earns ₹1 a unit. A combined ceiling of 35% of EFCI applies over five years. New units inside a zone also get ten years of electricity duty exemption, twice the usual period.
Swipe sideways to see every column
| Component | MSME, Category B |
|---|---|
| Capital subsidy | 25% of EFCIover 5 years, with micro units in year one |
| Interest subsidyon the term loan, and 8% for eligible MSMEs | 7% a year5 years, up to 10% of EFCI |
| Power tariff subsidyon DISCOM power | ₹1 a unit5 years, up to 25% of EFCI |
| Combined ceilingthe three together | 35% of EFCIover 5 years, at 7% a year |
Large port-based projects use the Large GR’s Category B column. A general-sector unit gets 10% capital subsidy over ten years, with a 15% ceiling. Thrust-sector units get 15% over eight years, with a 25% ceiling. All Large projects register with the Industries Commissionerate before commercial production or by 8 December 2026, whichever is later. The matrices are in the Viksit Gujarat Industrial Policy 2026 guide.
Which incentives apply in Mundra and Kandla SEZ
Two sets of rules meet at these ports. The State’s heads apply to manufacturers on both sides of the zone gate, while the customs route differs: SEZ rules inside, MOOWR or EPCG outside.
What Mundra and Kandla make, and the schemes that fit
Port industry lives on its imports, so the customs side of a Kutch project is usually worth as much as the State subsidy. Which customs route applies depends on the gate. Zone units use the SEZ Act, and the factories around them use MOOWR or EPCG.
Swipe sideways to see every column
| Sector | Where | Schemes that usually matter most |
|---|---|---|
| Export manufacturing inside the zones | Kandla SEZ, Mundra SEZ | Ten years of electricity duty exemption in Gujarat, duty-free imports under the SEZ Act in place of MOOWR or EPCG, and the Category B package on new plant |
| Port-based processing: edible oil, timber, grain | Kandla, Gandhidham, Mundra | The MOOWR scheme on imported inputs for factories outside the zones, capital and interest subsidy on new plant, and EPF reimbursement in Gujarat on new hires |
| Textiles, plastics and chemicals | Mundra SEZ and the land around it | Power tariff subsidy in Gujarat on the process load. Chemicals are a thrust sector for Large units with CETP access, and Large units register with the Industries Commissionerate |
| Steel pipes, engineering and fabrication | Mundra, Anjar | Pipe mills and fabricators claim capital and interest subsidy. Exporters among them bring in lines under the EPCG scheme |
| Logistics, warehousing and packaging | Gandhidham, Mundra | The State schemes are for manufacturing and processing: a warehouse or trading unit does not qualify, while a processing or packing line with its own plant and machinery is assessed on that investment |
Worked example of a pipe-extrusion MSME outside the Mundra zone
A small enterprise extrudes pipes and profiles on private industrial land in Mundra taluka, outside the zone. It has ₹22 crore of eligible investment, a ₹13 crore term loan and a 1,200 kW connection from PGVCL. Mundra taluka’s Category B rates are 25%, 7% and ₹1 a unit, and the three are capped together at 35%.
₹22 crore extrusion plant near Mundra port
The plant has four extrusion lines, a compounding section and a raw-material silo yard, and brings polymer in through the port. It is a small enterprise by plant-and-machinery value.
- Eligible fixed capital investment (plant, machinery, building, utilities, with land excluded): ₹22 crore
- Term loan of ₹13 crore at 9.5% over 7 years, 1-year moratorium. The unit still bears 2.5%
- Contracted load 1,200 kW, run 6,000 hours a year, so 7.2 million units bought from PGVCL
- Outside a GIDC estate, so the unit can also claim the power connection refund of 35% of PGVCL’s service-line charges, up to ₹5 lakh
- Capital subsidy, 25% of EFCI₹5.5 crore
- Interest subsidy, 7% on the balance for 5 years (₹3.64 crore before the 10% cap)₹2.2 crore
- Power tariff subsidy, ₹1 a unit on 7.2 million units a year for 5 years (₹3.6 crore before the 25% cap)₹3.6 crore
- The three components added₹11.3 crore
- Combined ceiling, 35% of EFCI over 5 years₹7.7 crore
₹7.7 crore under VGIP 2026, not ₹11.3 crore. Here the ceiling is the number, drawn at up to ₹1.54 crore a year for five years. On the customs side the unit takes a licence under the MOOWR scheme from the Mundra Commissionerate to defer the duty on its imported lines. The electricity duty exemption in Gujarat runs five years for this unit, and inside the zone it would run ten.
The figures here are illustrative and rounded. Try your own on the Gujarat subsidy calculator.
How a claim runs for a unit in Mundra and Kandla SEZ
Start by asking which side of the gate the unit is on. Inside a zone, approvals and duty-free imports run through the Development Commissioner. Outside, MOOWR is licensed by the Mundra Commissionerate for Mundra taluka or the Kandla Commissionerate for Gandhidham, and EPCG by DGFT Ahmedabad. In both cases the State claim goes to the District Industries Centre at Bhuj.
The State deadlines do not change with the gate. CEICED must get the electricity duty exemption application within 90 days of the start of production. The MSME eligibility certificate is due within six months of the date of commercial production. A Large port-based project registers with the Industries Commissionerate by 8 December 2026, or before commercial production when that date is later.
Questions we get asked about Mundra and Kandla SEZ
Are Mundra SEZ and Kandla SEZ in Category A or Category B talukas under VGIP 2026?
Both are in Category B talukas. Mundra SEZ stands in Mundra taluka and Kandla SEZ in Gandhidham taluka. The taluka GR of 8 September 2026 lists these two, along with Anjar, Bhachau, Bhuj and Abdasa, in Category B. Kachchh’s Category A talukas are Rapar, Nakhatrana, Lakhpat and Mandvi. So an MSME at either port works with 25% capital subsidy, 7% interest subsidy, ₹1 a unit and a 35% ceiling. We put the category in writing before you file.
Does a new unit in Mundra SEZ or Kandla SEZ get ten years of electricity duty exemption?
Yes, ten years, counted from the date production starts. A unit outside the zone gate gets five. In both cases the unit has to ask for it, through an online application to CEICED within 90 days of production. Once CEICED’s certificate reaches the distribution licensee, the duty comes off the bill.
How do the customs schemes differ inside the zone and outside the gate?
A unit inside a special economic zone imports machinery and inputs duty-free under the SEZ Act and does not need MOOWR or EPCG. Outside the zone, a factory chooses between the two. MOOWR defers the duty on machinery and inputs with no export obligation, under a licence from the Customs Commissionerate. EPCG waives the duty on machinery against exports of six times the duty saved in six years.
Which Customs office handles a plant at Mundra, and which one at Gandhidham?
Two different Customs offices handle the two places. The Principal Commissioner of Customs, Mundra, has the whole of Mundra taluka, including the port and the SEZ. Kandla’s Commissioner of Customs has the rest of Kachchh district, including Gandhidham, Anjar and Deendayal Port. The split comes from CBIC Notification 21/2022-Customs (N.T.), and a MOOWR licence is taken from the office that covers the plant’s taluka.
Who supplies power inside Mundra SEZ, and does it change the subsidy?
Inside Mundra SEZ the supplier is MPSEZ Utilities, the zone’s deemed distribution licensee. Outside it, and across the rest of Kutch, it is PGVCL. The power tariff subsidy of ₹1 a unit in a Category B taluka is paid on power bought from any distribution licensee. Its cap is 25% of eligible fixed capital investment. So the licensee does not change the figure.
Kandla SEZ dates from 1965. Can a long-standing zone unit claim under VGIP 2026?
New investment is the only part that can claim. A unit already in production before 1 June 2026 stays under the earlier scheme for what it has. An expansion or diversification that meets the GR’s tests is assessed under VGIP 2026 on the new investment alone. For an expansion, those tests start with at least 50% more fixed capital investment at the same premises.
Does a Large port-based project have to register by 8 December 2026?
It must register with the Industries Commissionerate before commercial production or by 8 December 2026, whichever is later, and a late application is not eligible. Large means more than ₹125 crore of plant and machinery. The provisional eligibility certificate is then applied for within three months of production or registration.
Does a trading or warehousing unit in a zone qualify for the State subsidies?
No. The VGIP 2026 schemes are for enterprises engaged in manufacture, production, processing or job work. So a pure trading, warehousing or logistics unit is outside them, in a zone or out of it. A unit that processes or packs goods with its own plant and machinery is assessed on that investment.
Legal basis and official sources
Classification of talukas into Category A and B
Annexure-A lists all 268 talukas of Gujarat. Mundra and Gandhidham, the talukas of the two zones, are in Category B, and Rapar, Nakhatrana, Lakhpat and Mandvi are in Category A.
Download the GRScheme for assistance to Large, Mega and Ultra Mega industries
Matrices and the registration rule for larger units.
Download the GRNotes. Taluka categories are from the annexure to the taluka GR. DGFT and Customs jurisdictions are from Appendix 1A and CBIC Notification 21/2022-Customs (N.T.). Kandla SEZ’s dates are from the zone’s official history. Mundra SEZ’s notified area, free trade and warehousing zone, rail line and distribution licensee are from the developer’s published description, and sector descriptions are ours. Before filing we confirm zone boundaries, a unit’s zone or domestic-tariff-area status and a plot’s distribution licensee. We do this with the developer, the Development Commissioner and the District Industries Centre.
Port projects carry more filings than most: Customs, DGFT, the Development Commissioner and the State. The eligibility check is free and sets out which of them apply to your unit, with every figure and deadline. A subsidy consultant in Mundra has to cover all four.
Setting up at Mundra or Kandla, inside a zone or outside?
Inside the zone or outside it, the free check lists the State and customs schemes your unit can use.